  • Park Paths and Trails

    This layer displays paths and trails within parks that are maintained and/or operated by the City of Surrey Parks Division. View in COSMOS
  • Ten Year Plan

    The Ten Year Plan identifies all of the Municipal Engineering works (Road, Drainage, Energy, Water and Sewer) required to service the current population and the projected growth...
  • Capital Construction 2020

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS View...
  • Capital Construction 2017

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2016

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2015

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2014

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2013

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2012

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2010

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS.
  • Capital Construction 2009

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS.
  • Capital Construction 2008

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS.
  • Water Assemblies

    A complex device containing many components, such as an Air Valve, Blow Down and Blow Off, used to release air and drain down water mains.
  • Water Meters

    Devices used to measure the amount of water that flows through water connections. This layer is a spatial representation of data stored in the City's taxation system. Only...
  • Water Hydrants

    An outlet from a water main in which a hose can be attached for fire-fighting purposes. A device used for the connection of several water mains and may be used to reduce a water...
  • Water Fittings

    A device used for the connection of several water mains and may be used to reduce a water main pipe size to a smaller diameter.
  • Traffic Calming

    A point feature representing devices used to control the flow of traffic. Speed humps are rounded raised areas of asphalt on the roadway that are usually 80mm in height. They...
  • Sanitary Valves

    Points that control sewage flow. View in COSMOS
  • Sanitary Manholes

    Manholes are underground access structures along sanitary mains for the purpose of accessing and maintaining the sanitary mains. View in COSMOS
  • Sanitary Chambers

    End point of a lateral connection at the property line for the purpose of inspection.
You can also access this registry using the API (see API Docs).