186 datasets found

Formats: KML FGDB API

Filter Results
  • Capital Construction 2008

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS.
  • Capital Construction 2009

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS.
  • Capital Construction 2010

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS.
  • Capital Construction 2012

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2013

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2020

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS View...
  • Capital Construction 2016

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2015

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2014

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2017

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Capital Construction 2011

    Areas of major infrastructure projects being completed by the City of Surrey in the indicated year, all Capital Construction project outline areas from PTS. View in COSMOS
  • Water Utility Facilities

    Various facilities to withdraw potable water from groundwater sources (Wells), to temporarily store potable water (Reservoirs and Tanks), to pump potable water to a higher...
  • Water Sampling Stations

    A device used to measure water quality as it traverses a water main.
  • Water Pipe Bridges

    Point layer to indicate where a main pipe travels above ground over another feature, such as a road or creek.
  • Water Meters

    Devices used to measure the amount of water that flows through water connections. This layer is a spatial representation of data stored in the City's taxation system. Only...
  • Water Hydrants

    An outlet from a water main in which a hose can be attached for fire-fighting purposes. A device used for the connection of several water mains and may be used to reduce a water...
  • Water Fittings

    A device used for the connection of several water mains and may be used to reduce a water main pipe size to a smaller diameter.
  • Water Chambers

    A chamber structure containing objects such as a Valve Chamber, Zone Meter, Pressure Reducing or Pressure Sustaining.
  • Vehicular Bridges

    A point feature representing all vehicular bridges in the City of Surrey. Notable attributes include construction type and the presence and material of sidewalks and tire...
  • Traffic Signals

    This feature class consists of a point representing each type of traffic signal used to control the right of way for pedestrian or vehicular traffic flow. View in COSMOS
You can also access this registry using the API (see API Docs).